摘要
现如今,我国水利工程建设规模正在不断扩大,给人们的生产和生活带来极大的便利。但是,水利工程施工往往会对周边环境造成不同程度的破坏。因此,水利工程建设前要做好水工环地质灾害危险性评估工作,然后以该评估结果为依据来制定施工设计方案,全面地保护施工场地周边环境,同时有效地推动社会发展。基于此,笔者分析了水工环地质灾害危险性评估的影响因素,并提出水工环地质灾害危险性评估的优化措施,以期科学、高效地做好水工环地质灾害危险性评估工作。
Nowadays,the scale of construction of water conservancy projects in China is constantly expanding,bringing great convenience to people's production and life.However,water conservancy projects often cause varying degrees of damage to the surrounding environment.Therefore,before the construction of water conservancy projects,the risk assessment of the geological hazards of the hydraulic ring should be done,and then the construction design plan should be formulated based on the assessment results to comprehensively protect the surrounding environment of the construction site and effectively promote social development.Based on this,the author analyzes the influencing factors of the risk assessment of the hydraulic ring geological disasters,and puts forward the optimization measures of the risk assessment of the hydraulic ring geological disasters,in order to scientifically and efficiently complete the risk assessment of the hydraulic ring geological disasters.
作者
雷佳
Lei Jia(The Second Geological and Mineral Exploration Institute,Gansu Provincial Bureau of Geology and Mineral Exploration and Development,Lanzhou 730020,China)
出处
《中国资源综合利用》
2020年第7期163-165,共3页
China Resources Comprehensive Utilization
关键词
水工环
地质灾害
危险性评估
优化措施
hydraulic ring
geological disaster
risk assessment
optimization measures