摘要
随着大型海工装备出现和陆上拼装基地的建成,海上风机整体安装的优势愈加显著,应用范围越来越广。文中介绍了海上风机安装形式,研究了海上风机整体安装中精定位的作用、技术原理、不同桩基基础海上风机整体安装精定位的应用形式以及精定位技术的应用情况。通过对比发现精定位技术对于不同桩基基础的海上风机整体安装具有广泛适用性,可为今后不同桩基础的海上风机整体安装在定位环节提供参考。
With the emergence of large-scale marine engineering equipment and the construction of land-based assembly bases,the advantages of the integral installation of offshore wind turbine are more and more significant,and the application scope is more and more wide.We introduced the installation form of offshore wind turbine,and then studied the role of offshore wind turbine fine positioning in the integral installation,the technical principle,the application forms of precision positioning for offshore wind turbine with different pile foundations,as well as the application of fine positioning technology.Through comparison,it is found that the precision positioning technology has wide applicability for the integral installation of offshore wind turbine with different pile foundations,which can provide reference for the positioning of offshore wind turbine with different pile foundations in the future.
作者
杨超
刘玉霞
YANG Chao;LIU Yu-xia(New Energy Engineering Co.,Ltd.of CCCC Third Harbor Engineering Co.,Ltd.(Shanghai),Shanghai 200137,China)
出处
《中国港湾建设》
2020年第10期15-18,共4页
China Harbour Engineering
关键词
海上风机
整体安装
桩基础
精定位
offshore wind turbine
integral installation
pile foundation
fine positioning