期刊文献+

大采高末采工作面深孔预注浆加固技术研究 被引量:3

Research on Deep Hole Pre-grouting Reinforcement Technology in Large Mining Height and Final Mining Working Face
下载PDF
导出
摘要 为解决大采高工作面在末采阶段片帮、冒顶事故频发等问题,采用现场监测的手段研究工作面超前支承压力分布规律,分析工作面的可注性,选取了合理的注浆加固时机和范围,研发出高性能注浆加固材料,设计了深孔注浆封孔工艺。工程实践结果表明:注浆加固后的工作面在末采阶段未发生大范围片帮,工作面生产衔接安全正常。 In order to solve the problems such as rib spalling and collapse of roof frequently occur at the end of the high mining heights working face,field monitoring methods were used to study the distribution law of the advance bearing pressure of the working face,and the injectability of the working face was analyzed,reasonable timing and scope of grouting reinforcement were selected,high-performance grouting reinforcement materials were developed,deep-hole grouting and sealing processes were designed.Engineering practice shown that after grouting reinforcement,there is no large-scale rib spalling in the end mining phase of the working face,the production connection of working face is safe and normal.
作者 范建峰 Fan Jianfeng(Zhaozhuang Coal Industry of Shanxi Jinmei Group,Shanxi Jincheng 048000)
出处 《山东煤炭科技》 2020年第10期51-53,56,共4页 Shandong Coal Science and Technology
关键词 末采 综采 煤壁 注浆 final mining fully mechanized mining coal wall grouting
  • 相关文献

参考文献5

二级参考文献63

共引文献124

同被引文献15

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部