期刊文献+

综合物探方法在孤石探测中的可行性研究 被引量:2

Study on the feasibility of integrated geophysical prospecting method in the detection of Boulder
下载PDF
导出
摘要 针对厦门轨道交通1号线一期工程的地铁孤石问题,我司对厦门市轨道交通1号线一期工程高崎站~集美学村站区间地下孤石展开地球物理勘查工作。主要利用勘察钻孔,进行井间的地球物理探查,结合现场揭露的孤石,及时分析总结,并改进探测手段,争取获得针对厦门区域内地铁孤石探查的有效手段。 In view of the subway boulder problem in the first phase of the Xiamen Metro 1 line project,a geophysics investigation on the underground boulder between Gaoqi Station and Jimeixuecun Station of the first phase of the Xiamen Rail Transit Line 1 project have been launched.This paper mainly uses exploration and drilling holes to carry out cross-well geophysics exploration,combines with the exposed boulder on the spot,analyzes and summarizes in time,and improves the detection means,so as to obtain the effective means for the exploration of subway boulder in Xiamen area.
作者 王志彬 WANG Zhibin
出处 《福建建设科技》 2021年第3期27-30,共4页 Fujian Construction Science & Technology
关键词 孤石探测 地震跨孔CT 孔间电法CT 瞬变电磁法 Boulder detection SEISMIC CROSS-HOLE CT Cross hole electrical CT Transient electromagnetic method
  • 相关文献

参考文献3

二级参考文献29

共引文献52

同被引文献11

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部