隧洞通过地质软岩洞段时极易发生软岩大变形,形成安全隐患。通过从围岩条件、地质结构、支护措施、施工工艺等引发变形的各种因素,进行归类、分析,总结出一套适应褶皱挤压发育薄层碳质泥页岩地层中的变形控制措施和施工工艺,将隧洞变形量控制在一定范围内,减少侵线事件,提高施工效率。
Large deformation of soft rock occurs easily when the tunnel passes through the geological soft rock section,thus forming potential safety hazards.By classifying and analyzing various factors that causing deformation such as surrounding rock condition,geological structure,support measures and construction technology,a set of deformation control measures and construction technology adapted to fold compression development in thin layer of Carbon Mudstone shale formation is summarized,which can control tunnel deformation within a certain range,reduce line intrusion events and improve construction efficiency.
作者
王康
王艳张
WANG Kang;WANG Yan-zhang(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处
《云南水力发电》
2021年第6期9-13,共5页
Yunnan Water Power
关键词
褶皱挤压
碳质薄层软岩
变形控制措施
施工工艺
fold extrusion
carbon soft rock
deformation control measure