以综放作业面过空巷期间通风系统调整为对象开展探究。结合具体工程实际,在分析井下空巷现状及存在问题的基础上,对通风系统调整展开综合分析,并对其应用效果做出总结,希望能为其他矿井通风系统的优化改良提供借鉴。
The research was carried out on the adjustment of the ventilation system during the fully mechanized caving face pas-sing through empty roadways.Combined with the actual project,based on the analysis of the current situation and existing problems of the underground empty roadways,this paper carried out a comprehensive analysis of the adjustment of the ventilation system,and summarized its application effects,hoping to provide reference for the optimization and improvement of ventilation systems in other mines.