摘要 唐山市某污水处理厂设计规模为12×10^(4) m^(3)/d,出水标准为国标的一级A标准。本次提标改造工程要求在不新增用地的情况下,出水标准由原国标一级A标准提升到北京市地标《城镇污水处理厂水污染物排放标准》(DB 11/890—2012)的B标准。本次工程对多段AO生反池进行MBBR改造和精确曝气改造,深度处理采用臭氧催化氧化工艺,除臭采用全过程除臭,新建尾水排放管并安装水力发电装置。实际运行表明,本工程出水水质完全满足设计要求,运行良好。 The design capacity of a WWTP in Tangshan City is 12×10^(4)m^(3)/d,and the effluent standard is the national first grade A criterial.In the project of upgrading and expanding,the upgrading and reconstruction will be expanded without increasing the land occupation.The effluent standard will be upgraded from the national first grade A to B criteria of Beijing City local standard Discharge Standard of Water Pollutants for Municipal Wastewater Treatment Plants(DB 11/890—2012).The main reconstruction includs moving bed biofilm reactor(MBBR)and the accurate aeration in multistage AO process,and the advanced treatment uses catalytic ozonation,the deodorization uses plant-wide deodorization,and a new discharge pipe adopting hydro-electric power device is built.The actual operation shows that the effluent indicators of the project fully met the design requirements,and the actual operation state is good.
作者 朱洁 胡维杰 周娟娟 ZHU Jie;HU Weijie;ZHOU Juanjuan(Shanghai Municipal Engineering Design Institute<Group>Co.,Ltd.,Shanghai 200092,China)
出处 《净水技术》 CAS 2021年第12期139-146,共8页 Water Purification Technology
基金 上海市政工程设计研究总院(集团)有限公司科研课题(K2020K060)。
关键词 污水处理厂 高出水标准 提标改造 精确曝气 臭氧催化氧化 waste water treatment plant(WWTP) high effluent standards upgrading and reconstruction accurate aeration catalytic ozonation
  • 相关文献

参考文献7

二级参考文献48

共引文献184

同被引文献47

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部