密云水库调蓄工程多级泵站峰谷运行情况研究 被引量:1

Study on Peak-Valley Operation Condition in Multistage Pump Station
下载PDF
导出
摘要 为进一步提高密云水库调蓄工程运行管理中的工程效益,降低工程运行成本,文章结合北京市峰谷电价情况,根据历年工程调度运行经验及各泵站间渠道最大调蓄容量,提出泵站机组峰谷调度运行方式。泵站机组按照电价峰谷时段精准开停机组,并合理调整流量,通过计算验证,各项数据满足工程调度运行要求,为多级泵站节能降耗平稳运行提供了新思路。 The operation mode of the pump station unit peak and valley dispatching is proposed based on the peak-valley electricity price in Beijing according to the project dispatching operation experience over the years and the maximum regulation and storage capacity of each pump station channel in order to further improve the engineering benefit in the operation management of Miyun Reservoir Regulation and Storage Project and reduce the operation cost of the project.Pump station units are accurately turned on and off according to the peak and valley periods of electricity price.The flow is adjusted reasonably.All data meet the requirements of project dispatching and operation through calculation and verification.A new idea is provided for the stable operation of multistage pump stations with energy saving and consumption reduction.
作者 王鑫鑫 郝鸿晨 褚霄杨 WANG Xinxin;HAO Hongchen;CHU Xiaoyang(Beijing Tuancheng Lake Management Office of South-to-North Water Diversion Project, Beijing 100195, China)
出处 《中国水能及电气化》 2022年第3期42-45,共4页 China Water Power & Electrification
关键词 梯级泵站 分时电价 峰谷调度 节能 cascade pump station time-of-use electricity price peak-valley scheduling energy saving
  • 相关文献

参考文献2

二级参考文献2

共引文献26

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部