高出水标准要求下高含氟工业废水处理实践 被引量:3

Practice of High Fluorine Industrial Wastewater Treatment under the Requirement of High Effluent Standard
原文传递
导出
摘要 某液晶面板厂的高含氟高硬度废水处理厂的进水分为含氟废水及有机废水两股,含氟废水经过混凝沉淀+MBBR硝化预处理,降低硬度、F-及NH_(3)-N浓度后与有机废水混合,再采用生化处理+臭氧高级氧化+曝气生物滤池+高效沉淀+消毒组合工艺处理,最终出水水质稳定达到地表水Ⅳ类标准。该项目规模为6×10^(4) m^(3)/d,吨水投资约5935元/m^(3),单位占地面积为0.619 m^(2)/(m^(3)·d^(-1))。 The high fluorine and high hardness influent of a wastewater treatment plant in a liquid crystal panel factory includes fluorine containing wastewater and organic wastewater.The fluorine containing wastewater is pretreated by coagulation,precipitation and MBBR nitration to reduce the hardness,F-concentration and ammonia nitrogen,and then mixed with the organic wastewater.The mixed wastewater is eventually treated by a combined process consisting of biochemical treatment,ozone advanced oxidation,biological aerated filter,high efficiency precipitation and disinfection.The final effluent quality stably reaches the requirements of surface water classⅣlimitations.The capacity of this plant is 6×10^(4) m^(3)/d,the investment is approximately 5935 yuan/m^(3),and the footprint area is 0.619 m2/(m^(3)·d^(-1)).
作者 王小兵 曾佳玮 汤钟 WANG Xiao-bing;ZENG Jia-wei;TANG Zhong(Guangdong Architectural Design&Research Institute Co.Ltd.,Guangzhou 510150,China;Urban Planning&Design Institute of Shenzhen,Shenzhen 518000,China)
出处 《中国给水排水》 CAS CSCD 北大核心 2022年第10期83-89,共7页 China Water & Wastewater
关键词 含氟废水 高硬度废水 除钙高效沉淀池 除氟高效沉淀池 深度处理 fluorine containing wastewater high hardness wastewater high efficiency calcium removal settling tank high efficiency fluorine removal settling tank advanced treatment
  • 相关文献

参考文献9

二级参考文献57

共引文献89

同被引文献20

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部