期刊文献+

盾构法隧道断面变形特征有限元分析

Finite Element Analysis for Deformation Characteristics of Shield Tunnel
原文传递
导出
摘要 以上海轨道交通盾构法隧道为研究对象,建立有限元模型,分析盾构法隧道管片移动、转动以及变形程度,研究隧道断面变形特征。利用标准块水平直径以下部分绕下端部转动为主的断面变形特征,可反算标准块转角以及原始圆心坐标,并通过盾构法隧道受堆载影响导致的断面变形案例进行解算验证。 Taking the shield tunnel of Shanghai rail transit as the research object,a finite element model is established to analyze the movement,rotation and deformation of shield tunnel segment,and study the deformation characteristics of tunnel.According to the deformation characteristics of the standard segment below the horizontal diameter rotating mainly around the lower end,the rotation angle of standard segment and the original circle centre coordinates can be back-calculated.And the solution can be verified by the deformation cases of shield tunnel caused by stacking load.
作者 王蓉 邵华 Wang Rong;Shao Hua
出处 《隧道与轨道交通》 2022年第2期25-30,80,共7页 Tunnel and Rail Transit
  • 相关文献

参考文献2

二级参考文献21

  • 1何川,苏宗贤,曾东洋.盾构隧道施工对已建平行隧道变形和附加内力的影响研究[J].岩石力学与工程学报,2007,26(10):2063-2069. 被引量:81
  • 2李希元,闫静雅,孙艳萍.盾构隧道施工工程事故的原因与对策[J].地下空间与工程学报,2005,1(6):968-971. 被引量:42
  • 3戴宏伟,陈仁朋,陈云敏.地面新施工荷载对临近地铁隧道纵向变形的影响分析研究[J].岩土工程学报,2006,28(3):312-316. 被引量:97
  • 4王如路,肖同刚,朱妍.上海地铁盾构隧道渗漏水治理与变形控制[J].地下工程与隧道,2011(增刊2):102-108+136.
  • 5CHANG C-T, SUN C-W, DUANN S et al. Response of a Taipei Rapid Transit System (TRTS) tunnel to adjacent excavation[J]. Tunnelling and Underground Space Technology, 2001, 16(3): 151-158.
  • 6WANG F, HUANG H W, SOGA K, et al. Deformation analysis of a tunnel with concrete segmental lining subjected to ground surface loading using novel joint model[C]// Proceedings of World Tunnel Congress 2012: Tunnelling and Underground Space for a Global Society. Bangkok, 2012: 364-366.
  • 7CAVALARO S H P, BLOM C B M, WALRAVEN J C, et al. Structural analysis of contact deficiencies in segmented lining[J]. Tunnelling and Underground Space Technology, 2011, 26(6): 734-749.
  • 8CAVALARO S H P, AGUADO A. Packer behavior under simple and coupled stresses[J]. Tunnelling and Underground Space Technology, 2012, 28: 159-173.
  • 9YUAN Y, BAI Y, LIU J. Assessment service state of tunnel structure [J]. Tunnelling and Underground Space Technology, 2012, 27(1): 72-85.
  • 10肖明.盾构隧洞装配式衬砌三维非线性有限元分析[J].岩土工程学报,1997,19(2):106-111. 被引量:8