以礼河四级电站复建工程分标规划方案研究与实践

Research and Practice on Bidding Planning Scheme of Yilihe Fourth Cascade Hydropower Station Reconstruction Project
下载PDF
导出
摘要 以礼河四级电站复建工程分标规划为研究对象,结合水电工程规模大、投资大、工期长、项目复杂等特点,提出了分标原则;针对该工程施工条件及建管模式等,提出了分标方案;综合考虑影响分标的各种因素,确定了分标方案;通过招标及合同履行,证实了分标方案实施效果及注意事项;实现工程合法、合规建设管理。 Taking bidding planning of Yilihe Fourth Cascade Hydropower Station Reconstruction Project as research object,this paper puts forward the principle of bidding combining the characteristics of large-scale hydropower project,large investment,long construction period and complex project.According to the construction conditions and construction mode of the project,a bidding scheme is put forward.Considering various factors affecting the subdivision,the subdivision scheme is determined.By inviting bids and performing contracts,the implementation effect and precautions of the bid scheme are verified,and the construction management of the project is legal and compliant.
作者 邵增富 李福年 颜昆 胡福祥 SHAO Zeng-fu;LI Fu-nian;YANKun;HU Fu-xiang(China Huadian Corporation Ltd.,Beijing 100031,China;Huadian Yunnan Power Generation Co.,Ltd.,Kunming 650228,China)
出处 《云南水力发电》 2023年第5期150-153,共4页 Yunnan Water Power
关键词 四级复建 分标规划 方案研究 实践 fourth cascade reconstruction bidding planning scheme research practice
  • 相关文献

参考文献3

二级参考文献2

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部