摘要
公路隧道初期支护施工工序中喷射混凝土的施工是隧道建设不可或缺的重要工艺。喷射混凝土的施工损耗可显著影响整个项目的成本,如何降低喷射混凝土损耗率是贯穿隧道工程施工的一个重要难题。文章以狮子岭隧道工程作为研究案例,对隧道喷射混凝土超耗的原因进行简要分析,并提出针对性的控制措施。
The construction of sprayed concrete in the initial support construction process of highway tunnels is an indispensable of tunnel construction.The construction loss of sprayed concrete will significantly affect the cost of the entire project.How to reduce the loss rate of sprayed concrete is an important challenge throughout tunnel construction.This article takes the Shiziling Tunnel project as a research case,briefly analyzes the reasons for the excessive consumption of tunnel sprayed concrete,and proposes targeted control measures.
作者
李满强
LI Manqiang(The First Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou 510450,China)
关键词
狮子岭隧道
喷混凝土
超耗
原因
控制
措施
Shiziling tunnel
spraying concrete
excessive consumption
reason
control
measure