隧道初支喷射混凝土超耗原因及控制措施

Causes and control measures of excessive consumption of sprayed concrete for initial support of tunnels
下载PDF
导出
摘要 公路隧道初期支护施工工序中喷射混凝土的施工是隧道建设不可或缺的重要工艺。喷射混凝土的施工损耗可显著影响整个项目的成本,如何降低喷射混凝土损耗率是贯穿隧道工程施工的一个重要难题。文章以狮子岭隧道工程作为研究案例,对隧道喷射混凝土超耗的原因进行简要分析,并提出针对性的控制措施。 The construction of sprayed concrete in the initial support construction process of highway tunnels is an indispensable of tunnel construction.The construction loss of sprayed concrete will significantly affect the cost of the entire project.How to reduce the loss rate of sprayed concrete is an important challenge throughout tunnel construction.This article takes the Shiziling Tunnel project as a research case,briefly analyzes the reasons for the excessive consumption of tunnel sprayed concrete,and proposes targeted control measures.
作者 李满强 LI Manqiang(The First Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou 510450,China)
出处 《中国高新科技》 2023年第22期59-61,共3页
关键词 狮子岭隧道 喷混凝土 超耗 原因 控制 措施 Shiziling tunnel spraying concrete excessive consumption reason control measure
  • 相关文献

参考文献2

二级参考文献6

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部