Rapid Construction Technology for Large Span Roof Truss of Factory Building
下载PDF
导出
摘要 基于太阳能光伏电池封装材料一期项目工程案例,针对体量大、工期紧、跨度大的项目特点,开展大跨度、大体量屋面三角桁架快速高精度施工技术研究,形成相应的技术措施及成套施工工艺,有效满足目前工业厂房体量大、工期紧、跨度大的发展要求。 Based on the case study of the phase I project of solar photovoltaic cell packaging materials,in response to the characteristics of large volume,tight construction period,and large span projects,research is conducted on the rapid and high-precision construction technology of large span and large volume roof triangular truss,the corresponding technical measures and complete construction processes are formed,which effectively meet the development requirements of large volume,tight construction period,and large span industrial factories.
作者 张涛 ZHANG Tao(Shanghai Construction No.2(Group)Co.,Ltd.,Shanghai 200090,China)
出处 《建筑施工》 2023年第12期2423-2425,2467,共4页 Building Construction
关键词 工期紧 大体量 大跨度 三角桁架加工 高精度 tight construction period large volume large span triangle truss processing high precision
  • 相关文献

参考文献2

二级参考文献5

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部