摘要
针对铜陵市“四好农村路”民生工程建设过程中存在的资金紧张、后续管养不及时等问题,分析了项目建设与管养现状。通过实地调研获取了铜陵市“四好农村路”建设的完成情况,并采用数据分析的方法进行论述。结果表明,优化工程建设计划和民生工程管理是“四好农村路”后续建设的可行路径。
Aiming at the problems existing in the construction of the livelihood project of “Four Good Rural Roads” in Tongling City,such as the shortage of funds and untimely follow-up management and maintenance,this paper analyzes the present situation of project construction and management and maintenance.The completion of the construction of “Four Good Rural Roads” in Tongling City was obtained through on-the-spot investigation,and the data analysis method was used to discuss it.The results show that optimizing the project construction plan and the management of people's livelihood projects is a feasible path for the subsequent construction of “Four Good Rural Roads”.
作者
余伦明
YU Lun-ming(Tongling County Town Highway Management Service Center,Tongling 244000,China)
出处
《工程建设与设计》
2024年第4期78-80,共3页
Construction & Design for Engineering
关键词
四好农村路
民生工程
问题分析
优化建议
four good rural roads
people's livelihood project
problem analysis
optimization suggestion