期刊文献+

月球资源勘测与原位利用进展及关键挑战

Progress and Key Challenges of Lunar Resource Exploration and In-situ Utilization
下载PDF
导出
摘要 月面建造是人类探测、利用、开发月球的发展方向。围绕月面建造中用什么建、怎么建等关键问题,梳理了月球资源勘测与原位利用方向的研究进展。首先总结了面向月面原位资源利用的主要支撑技术,包括月壤特性分析、模拟月壤制备、月壤原位成型等关键技术;其次,介绍了月球基地智能建造进展,包括月面建筑方案的构想发展历程、原位建造技术对比、月球基地建造环境分析等;最后,总结了月球资源原位利用及月球基地建造在资源勘测、建造科学选址、月基承载安全、原位熔融成型、太空建造方案等方面的关键科学挑战。 Lunar construction(LC)is one of the important future directions of human exploration,utilization,and development of the Moon.This paper reviews the research progress of LC and in-situ resource utilization(ISRU),focusing on the key basic science issues including what materials to use and how to build.First,the main supporting technologies for ISRU on the lunar surface are summarized,including lunar soil property analysis,lunar soil simulant preparation,and lunar soil in-situ additive manufacturing technologies.Second,the progress of the intelligent construction of the lunar base is introduced,including the development of the lunar base construction scheme,the comparison of in-situ construction technology,and the analysis of the lunar base construction environment.Finally,the key scientific challenges of LC and ISRU are discussed,including resource exploration,scientific site selection,lunar base bearing safety,lunar soil melting and sintering,and space construction schemes.
作者 童小华 袁烽 郑虎 晏雄锋 王超 谢欢 许雄 徐聿升 陈鹏 魏超 TONG Xiaohua;YUAN Feng;ZHENG Hu;YAN Xiongeng;WANG Chao;XIE Huan;XU Xiong;XU Yusheng;CHEN Peng;WEI Chao(College of Surveying and Geo-informatics,Tongji University,Shanghai 200092,China;Shanghai Key Laboratory for Planetary Mapping and Remote Sensing for Deep Space Exploration,Tongji University,Shanghai 200092,China;College of Architecture and Urban Planning,Tongji University,Shanghai 200092,China;State Key Laboratory of Disaster Reduction in Civil Engineering,Tongji University,Shanghai 200092,China;College of Civil Engineering,Tongji University,Shanghai 200092,China)
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第8期1151-1162,F0002,共13页 Journal of Tongji University:Natural Science
基金 国家自然科学基金(42221002) 土木工程I类高峰学科建设经费 中央高校基本科研业务费专项资金。
关键词 深空探测 月球建造 原位资源利用 模拟月壤 deep space exploration lunar construction in-situ resource utilization lunar soil simulation
  • 相关文献

参考文献21

二级参考文献186

共引文献186

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部