摘要
灌注桩作为常用的基础工程结构,广泛应用于各类建筑和桥梁工程中。然而,在淤泥地质条件下,由于淤泥具有水分含量高、抗剪强度低等特点,给灌注桩施工带来了诸多挑战。论文旨在分析淤泥地质条件下灌注桩的施工要点,针对淤泥地质特性,探讨灌注桩施工过程中的关键技术措施,以提高施工质量和工程安全性。论文首先介绍了淤泥地质的特点及其对灌注桩施工的影响,然后详细阐述了灌注桩施工的主要步骤和技术要点,期望能够给同领域专业技术人员提供一定理论参考。
As a commonly used foundation engineering structure,cast-in-place piles are widely used in various types of construction and bridge engineering.However,under the geological conditions of silt,due to the characteristics of high moisture content and low shear strength,the construction of cast-in-place piles has brought many challenges.The purpose of this paper is to analyze the key points of cast-in-place pile construction under silt geological conditions,and discuss the key technical measures in the construction process of cast-in-place piles according to the geological characteristics of silt,so as to improve the construction quality and engineering safety.This paper first introduces the characteristics of silt geology and its influence on cast-in-place pile construction,and then elaborates the main steps and technical points of cast-in-place pile construction,hoping to provide some theoretical reference for professional and technical personnel in the same field.
作者
陈俊宇
Junyu Chen(China Coal Jiangnan Construction&Development Group Co.,Ltd.,Guangzhou,Guangdong,510030,China)
出处
《工程设计与施工》
2024年第7期83-85,共3页
Engineering Design and Construction
关键词
淤泥地质
灌注桩
施工
要点
silt geology
cast-in-place piles
construction
essentials