摘要
介绍了1999年首次安装在渤海锦州9 3地区多筒基础平台安装施工过程中的侧摩阻力原型测试研究,描述了筒型基础下沉和上拔过程中筒壁侧摩阻力的测试系统和测试方法,给出了主要测试结果并与现行规范进行了对比分析.这项成果对筒型基础平台的设计和施工具有直接的参考意义.
Two mooring dolphin platforms with bucket foundations were installed in JZ9 3 field of the Bohai Sea in 1999. Several items of the field measurements were performed during the installation. This was the first time in the country to carry out a series of full scale tests in the bucket foundation platform installation. This paper introduces briefly the measuring methods, instrumentation system and the main results of the lateral soil friction forces measurement during the penetration down/pulling up processes of the buckets. According to the results, discussions are given, and suggestions for the bucket foundation platform design are presented.
出处
《天津大学学报(自然科学与工程技术版)》
EI
CAS
CSCD
北大核心
2003年第1期63-67,共5页
Journal of Tianjin University:Science and Technology