立足科技 坚持“三化”目标 开创铁路工务工作新局面——2002年铁路工务工作总结与2003年工作重点

Rely on Science & Technology and Persist in the Modernization and Optimization Goal to Create a New Prospect of Permanent Way Work—Summary of Work on Permanent in 2002 and Key Work in 2003
下载PDF
导出
摘要 总结了铁路工务部门2002年在探索工务修程修制改革,巩固和完善提速成果,安全生产,线桥修理,基础建设等5个方面取得的成果,并指出了2002年工务工作存在的主要问题;分析了2003年工务工作面临的形势;提出了2003年工务工作继续以“线桥结构现代化,施工作业机械化,企业管理科学化”为指导方针的工作重点。 This paper summarizes the achievements made by the railway permanent way sectors in year 2002 in the following five respects:reform on permanent way repair standards and systems, the consolidation and improvement on speed-increase achievemen, safeproduction, track and bridge maintenance as well as infrastructure construction. It also points out the major problems in permanentway work in 2002 and analyzes the future challenge in 2003. This paper further proposes the key work on permanent way in 2003,guided by the principle of the modernization of track and bridge structure, mechanization of construction and operation andoptimization of enterprise management.
作者
出处 《中国铁路》 北大核心 2003年第1期24-28,共5页 China Railway
关键词 2002年 铁路工务工作 科技 安全生产 线桥维修 养路机械化 工务管理 提速工程 工作总结 railway permanent way , safe production, track and bridge maintenance, mechanization of track maintenance,management of permanent way, speed-increase.
  • 引文网络
  • 相关文献
;
使用帮助 返回顶部