摘要
根据大体积混凝土结构施工经验 ,阐述了应着重控制混凝土温度升高 ,延缓混凝土降温速度 ,采取施工温度变化监测等措施 。
Based on construction experiences of mass concrete and according to the temperature cracks prevention in this paper some measures are mainly elaborated, which contain the temperature control of concrete, reducing cooling rate and concrete shrinkage and other restraint design to prevent and reduce concrete cracks.
出处
《山西建筑》
2003年第4期85-86,共2页
Shanxi Architecture
关键词
大体积混凝土
温度裂缝
后浇带
保温
mass concrete, temperature crack, the late poured band, thermal insulation