摘要
通过对汾河水库库区上游水土流失情况及库区上游有利的筑坝条件分析,对汾河水库库区上游大规模开发淤地坝可行性进行分析研究。
Through the analysis on the situation of soil and water loss and on the favourable conditions,under which the check dams are to be constructed,that it is feasible to construct the check dam on large scale in upstream basin of the Fenhe Reservor is clarified.
出处
《山西水利科技》
2003年第2期25-26,共2页
Shanxi Hydrotechnics