摘要
着重介绍朔黄铁路 DK2 73+ 4 2 0~ DK2 74+ 2 1 0段裂土路堑的工程处理措施和效果 。
This paper places emphasis on introducing processing measures and its effects to cracking soil cutting of Shuo Huang railway(DK273+420~DK274+210) It can be a good reference to similar works
出处
《石家庄铁道学院学报》
2003年第B07期103-105,共3页
Journal of Shijiazhuang Railway Institute