摘要
结合205国道蕉岭至梅州环城北路段公路改造工程,分析路面板底出现脱空区的原因,寻求判断脱空区的方法,根据压浆补强原理提出压浆材料的选用、压浆工艺、压浆质量控制要求与检测方法。
Combined with the highway reconstruction project for the national road in the northem section
around city from Jiaolin to Meizhou, this paper analyzes the cause of producing pumping area in the pave-
ment slab bottom, searches for the methods of judging this pumping area, and presents the pressure mortar
material selection, the pressure mortar procedures, and the control requirement and examination methods of
the pressure mortar quality.
出处
《广东工业大学学报》
CAS
2003年第3期76-80,共5页
Journal of Guangdong University of Technology
关键词
桥头搭板
水泥砼路面板
脱空区
压浆技术
lapping slab at bridge head
cement concrete pavement slab
pumping area
pressure mortar technique