摘要
针对西丽水库环库污水截排工程,截流设施近期采用截流井配合截流堰的方式,远期采用雨污分流方式。工程投入运行后,已达到截排合流污水,削减入库污染负荷的目标。
For the project of vvastewater intercepting and discharge facilities around Xili reservoir. And trap basin and intercepting weir are built in the near future and split (low mode of waslewater and rainwater is used in the long future. After the project is put into operation, vvastewater is stopped from flowing into the reservoir and water quality of the reservoir is improved.
出处
《有色冶金设计与研究》
2003年第4期58-60,共3页
Nonferrous Metals Engineering & Research
关键词
水源保护
合流污水
分流制
截流堰
西丽水库
Xili reservoir, water source protection, combined sewage, split flow system, intercepting weir