摘要
结合某工程冬季施工实践 ,就混凝土的冻害特征作了介绍 ,通过分析冻害产生的原因 ,阐述了冻害的治理方法 。
Based upon practice in winter construction the features of frost damage of concrete are introduced and through causes analysis practical prevention and treatment measures are proposed. In addition, the matters needing attention in applying combined thermal storage method are summarized.
出处
《山西建筑》
2004年第10期48-49,共2页
Shanxi Architecture
关键词
混凝土冻害
冬季施工
综合蓄热法
凝结硬化
frost damage of concrete, winter construction, combined thermal storage method