摘要
本文从国际项目EPC管理中的设计(E)、采办(P)、施工(C)等方面,对储罐铝拱顶的漏水的预防措施进行了深入分析并论证,通过AB两家不同的供应商产品压条结构及密封设计的不同,阐明科学设计的理念至关重要。同时,甄选优秀的供应商及高质量产品,对铝拱顶漏水的影响足够深远。此外,详细论述了施工过程管控与铝拱顶漏水紧密关联,应加强施工流程管理及质量控制的措施,确保完工后的铝拱顶达到设计要求,满足喷淋或者雨水测试,达到交工条件。该问题的提出及论证,对于未来类似的国际项目中铝拱顶漏水的预防,具有重要的借鉴意义。
In this paper, from the design (E), procurement (P), construction (C) and other aspects of EPC management of international projects, the prevention measures of water leakage in the aluminum dome of storage tank were analyzed and demonstrated deeply. It is crucial to clarify the concept of scientific design through the difference in the laminate structure and sealing design of products of two different AB suppliers. At the same time, the selection of excellent suppliers and high-quality products has a profound impact on the leakage of aluminum dome. In addition, the construction process control is closely related to the leakage of the aluminum dome, and the construction process management and quality control measures should be strengthened to ensure that the completed aluminum dome meets the design requirements, meets the spray or rain testing, and meets the delivery conditions. The proposal and demonstration of this issue have important reference significance for the prevention of aluminum dome leakage in similar international projects in the future.
出处
《石油天然气学报》
CAS
2020年第2期274-283,共10页
Journal of Oil and Gas Technology
关键词
铝拱顶
储罐
漏水
措施
Aluminum Dome
Storage Tank
Leakage
Measures