期刊文献+

Lectotype Optimization of Offshore Platforms by Use of Three-Scale Fuzzy Analytical Hierarchy Process 被引量:2

Lectotype Optimization of Offshore Platforms by Use of Three-Scale Fuzzy Analytical Hierarchy Process *
下载PDF
导出
摘要 A Three-Scale Fuzzy Analytical Hierarchy Process (T-FAHP) is proposed by introducing the Three-Scale Analytical Hierarchy Process (T-AHP) and the trapezoid fuzzy number. A multi-objective optimization model based on the T-FAHP is presented subsequently, in which many factors influencing the lectotype of offshore platform are taken into account synthetically, such as the original investment, the maintenance, cost, the ability of resisting fatigue and corrosion, the construction period, the threat to the environment, and so on. With this method, the experts can give the relatively precise ranking weight of each index and at the same time the requirement of consistence checking can be met, The result of a calculation example shows that the T-FAHP is practical. A Three-Scale Fuzzy Analytical Hierarchy Process (T-FAHP) is proposed by introducing the Three-Scale Analytical Hierarchy Process (T-AHP) and the trapezoid fuzzy number. A multi-objective optimization model based on the T-FAHP is presented subsequently, in which many factors influencing the lectotype of offshore platform are taken into account synthetically, such as the original investment, the maintenance, cost, the ability of resisting fatigue and corrosion, the construction period, the threat to the environment, and so on. With this method, the experts can give the relatively precise ranking weight of each index and at the same time the requirement of consistence checking can be met, The result of a calculation example shows that the T-FAHP is practical.
出处 《China Ocean Engineering》 SCIE EI 2001年第2期153-164,共12页 中国海洋工程(英文版)
基金 This work was financially supported by the National Natural Science Foundation of China(Grant No.59895410)
关键词 lectotype optimization offshore platform three-scale analysis fuzzy method hierarchy process trapezoid fuzzy number lectotype optimization offshore platform three-scale analysis fuzzy method hierarchy process trapezoid fuzzy number
  • 相关文献

参考文献11

  • 1[1]CHENG Chinghsue, 1999, Evaluating weapon systems using ranking fuzzy numbers, Ruzzy Sets and Systems, 107 (1): 25 ~35.
  • 2[2]CUI Huanjin, 1992. The Engineering Geological Structure in Shallow Water Area of Shengli Oil Field, China Offshore Plat form, 7 (5): 222~225. (in Chinese)
  • 3[3]Dubios, D. and Prade, H., 1978. Operations on Fuzzy Numbers, International Journal ofSystems Science, 9 (5): 613~ 626.
  • 4[4]JIA Hongxun, WANG Guizhong and GONG Musen, 1989. Application of AHP to Evaluation Total Performance of Machinery, Systems Engineering-Theory and Practice, 8 (1): 18~25. (in Chinese)
  • 5[5]Lee, Yucheng, 1998. The New Development of the Offshore Engineering Technique, China Offshore Platform, 13 (1): 9~12. (in Chinese)
  • 6[6]Miroslaw, J. S. and CHAO Lichung, 1992. Evaluation of Advanced Construction Technology with AHP Method, JournalofConstructionEngineeringandManagement, 118(3): 577~593.
  • 7[7]MU Jinbo, 1997. Application of the Analytical Hierarchy Process Method for Selecting the Optimal Environmental Engineering Scheme, Advances in Environmental Science, 5 (4): 33~38. (in Chinese)
  • 8[8]Saaty, T. L., 1977. A Scaling Method for Priorities in Hierarch Structures, Journ al ofMath Psychology, (15): 234~281.
  • 9[9]SUN Jale and JIANG Depeng, 1991. A Method of Constructing a Consistency Judgment Matrix in Hierarchical Analysis, Journal of Southeast University, 21 (3): 59~67. (in Chinese)
  • 10[10]Zadeh, L. A., 1965. Fuzzy Sets, Information andControl, (8): 338~353.

同被引文献16

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部