Construction of China's BiggestHeavy Derrick/Lay Barge Started
Construction of China's BiggestHeavy Derrick/Lay Barge Started
-
1Hao Ziguo,Fei Hongcai,Liu Lian.China Shale Gas Project Started[J].Acta Geologica Sinica(English Edition),2012,86(4):1038-1038.
-
2Hao Ziguo,Fei Hongcai,Liu Lian.Chinese Shale Gas Exploration Started Officially and Primary Results Achieved[J].Acta Geologica Sinica(English Edition),2012,86(6):1594-1594. 被引量:4
-
3Li-zhong WANG Feng YUAN Zhen GUO Ling-ling LI.Numerical analysis of pipeline in J-lay problem[J].Journal of Zhejiang University-Science A(Applied Physics & Engineering),2010,11(11):908-920. 被引量:7
-
4Wang Shufen(senior geologist of China National Offshore Oil Corporation).Outstanding Development of Laybarge Installation Technique by Bohai Oil Corp[J].China Oil & Gas,1994,1(1):48-48.
-
5Large Oil Platform Barge-loaded ThroughSliding Track First in China[J].China Oil & Gas,1997,4(4):230-230.
-
6Design of the Largest in China Aniline Unit Started[J].China Petroleum Processing & Petrochemical Technology,2008,10(1):40-40.
-
7Seminars Address China's Energy Strategy[J].China Oil & Gas,1998,5(4):248-248.
-
8胡少伟,聂建国,王伟,陈淮.Dynamic Assessment of the Carrying Capacity of Oilfield Derricks[J].Tsinghua Science and Technology,2001,6(1):63-66.
-
9匡涛,叶茂,段梦兰,刘卓,刘洋,焦晓楠,房凯.轻型J-lay系统技术分析与模型试验[J].石油机械,2014,42(1):47-51.
-
10Yannick Glemarec(Deputy President Representative,UNDP Beijing).UNDP Supporting China's CBM Industry[J].China Oil & Gas,1999,6(1):77-77.