摘要
本文介绍了呼和浩特西站(DS6-K5B 计算机联锁系统)与呼和浩特站增加三线工程改造施工的相关过程和经验,重点阐述了大型站场含控制台改造需要注意的问题。
The paper introduces relevant processes and experiences with regard to adding the third line in reconstruction between Hohhot West Station (DS6-KSB type computer interlocking system) and Hohhot Station, and sets forth particularly the issues needed to be paid attention to in the reconstruction of large scale stations and yards with consoles.
出处
《铁路通信信号工程技术》
2005年第4期19-20,共2页
Railway Signalling & Communication Engineering