摘要
针对建设项目施工的资源配置具有模糊性的特点,应用模糊数学综合评价方法,通过建立系统、完整的评价指标体系,建立了工程项目施工的资源配置综合评价数学模型,对工程项目施工的资源配置进行了客观、全面、精确的评价。
This paper puts forword the method of fuzzy overall evalution for allocation of project construction resources which have the fuzzy properties. With a systematic and complete mexsurement index system has been described, a fuzzy mathematic model has been established for evaluation allocation of project construction resources, The model can be used to evalution allocation of project construction resources in a objective, overall and precise way.
出处
《山西建筑》
2005年第18期6-7,共2页
Shanxi Architecture
关键词
项目施工资源配置
模糊层次分析法(FAHP)
模糊综合评价
allocation of construction project resources, analytical hierarchy process(AHP), fuzzy overall evaluation