合同双方联合角度的R&D项目激励机制优化研究 被引量:8

Study on Incentive Mechanism Optimization ofR&D Project form Both Sides of the Contract
下载PDF
导出
摘要 时间是决定R&D项目成败的关键因素,因此业主通常都设置激励机制以确保项目按期完成,但长期以来对激励机制本身的优化并没有深入的研究。为此,本文首先对激励机制进行了界定,然后在传统资源约束型项目进度问题中引入了激励机制和柔性资源约束,从合同双方联合的角度构建了R&D项目的激励机制优化模型。通过求解该模型,可获得与特定截至日期相对应的最优激励强度,该激励强度下的项目进度使合同双方同时获得最大收益。最后通过数值算例对研究结果做了说明。 Time is the primary factor to the outcome of R&D project, so the client usually setup incentive mechanism to insure the project being completed on schedule, but there is no expert study on the optimization of incentive mechanism itself. In this paper, we define the conception of incentive mechanism, introduce incentive mechanism and flexible, resource constraint to traditional resource constrained project scheduling problem to formulate incentive mechanism optimization model of R&D project from both sides of the contract. By solving the model we can obtain the optimal incentive intensity to given dead date. Both sides of the contract can attain maximal income under the schedule with the optimal incentive intensity. Ultimately, the outcomes of the paper are illustrated by an instance.
出处 《科研管理》 CSSCI 北大核心 2006年第4期110-115,共6页 Science Research Management
基金 国家自然科学基金海外杰出青年基金B类项目(70028102)
关键词 R&D项目 激励机制 柔性资源约束 激励强度 R&D project incentive meehanism~ flexible resource constraint incentive intensity
  • 相关文献

参考文献18

  • 1Catherine Penn. R&D survey: New role for CEOs and spectacular R&D efficiencies create high expectations. Beverage Industry[J]. 2004, 95(1): 35-40.
  • 2Mol, Michael J. ; Pauwels, Pieter; Matthyssens, Paul; Quintens, Lieven, A technological contingency perspective on the depth and scope of international outsourcing. Journal of international Management[J]. 2004, 10(2) : 287 -305.
  • 3Herroelen W, Reyck B D, Demeulemeester E. Resource-constrained project scheduling: a survey of recent developments [J]. Computers and Operations Research, 1998, 25(4) : 279 -302.
  • 4Shrub, Avraham; LeBlanc, Larry J. ; Cai, Ziyong. Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair - wise swap algorithm[J]. European Journal of Operational Research. 1996, 88(1): 124-138.
  • 5Etgar, Ran; Shrub, Avraham; LeBlanc, Larry J. Scheduling projects to maximize net present value - the case of time -dependent, contingent cash flows [J]. European Journal of Operational Research. 1997, 96(1) : 90 -96.
  • 6Ahn, Taeho; Erenguc, S. Selcuk. The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure[J]. European Journal of Operational Research. 1998, 107(2) : 250 -259.
  • 7Kogan, Konstantin; Shrub, Avraham. Scheduling projects with variable - intensity activities: The case of dynamic earliness and tardiness costs[J]. European Journal of Operational Research. 1999, 118(1) : 65 -80.
  • 8Luh, Peter B. ; Liu, Feng; Moser, Bryan. Scheduling of design projects with uncertain number of iterations[J]. European Journal of Operational Research. 1999, 113 (3): 575-592.
  • 9Kolisch R, Pedman R. An integrated survey of deterministic project scheduling [J]. Omega, 2001, 29 (3) : 249 -272.
  • 10De Reyck B, Herroelen W. The multi - mode resource - constrained project scheduling problem with generalized precedence relations [J]. European Journal of Operational Research. 1999, 119(2) : 538 -556 .

二级参考文献2

共引文献11

同被引文献83

引证文献8

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部