针对长平公司长平井区综采工作面设备数量多、体积大、吨位重、搬迁时间紧张,进行了搬迁技术改进,取得了较好的效果,并对今后缩短综采工作面搬迁时间提出了预防措施。
Changping area of long- equipment number of fully mechanized mining face, large in size and weight, relocation of time, the relocation of technological improvements,achieving better results. Comprehensive relocation face future to shorten the time for preventive measures.
出处
《煤矿机械》
北大核心
2006年第12期185-187,共3页
Coal Mine Machinery
关键词
综采工作面
搬迁时间
搬迁技术
comprehensive face
time to move
removal technology