摘要
在倒角斜面砼的施工中如何降低砼表面的蜂窝、麻面、砂斑、砂线,一直是工程施工的一个难题。通过对皂河三线船闸闸室墙倒角施工工艺的改进,斜面砼表面质量得到了较好的控制。
During construction of inclined surface concrete for chamfer, it has always been a tough problem to reduce the occurrence of voids, pits and sand spots, etc. on the surface of concrete. Through improvement of construction technology of chamfer of Zaohe River Third-line Lock's chamber wall, the inclined surface concrete quality has been well controlled.
出处
《水运工程》
北大核心
2007年第4期99-101,共3页
Port & Waterway Engineering
关键词
皂河三线船闸
闸室墙倒角施工
表面质量
Zaohe River third-line shiplock
chamfer of lock's chamber wall
construction
surface quality