摘要
中关铁矿帷幕灌浆孔设计深度深、钻孔垂直度要求高,加之地质条件、水文条件的特殊性和复杂性,钻孔偏斜超标严重,经过实践,摸索出一套有效的防斜、纠斜技术措施。在分析孔斜原因的基础上,介绍了该工程的防斜、纠斜技术措施和取得的效果。
Curtain grouting design for Zhongguan iron mine demands big depth and high verticality, but under the complex geological and hydrological conditions, borehole deviation is serious. This paper presents control and correction measures with analysis on the cause of deviation.
出处
《探矿工程(岩土钻掘工程)》
2007年第5期30-32,共3页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
帷幕灌浆
实验孔
孔斜
防斜
纠斜
curtain grouting
experimental hole
hole deviation
deviation control
deviation correction