期刊文献+

Construction Simulation and Real-Time Control for High Arch Dam 被引量:6

Construction Simulation and Real-Time Control for High Arch Dam
下载PDF
导出
摘要 A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam. A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam.
出处 《Transactions of Tianjin University》 EI CAS 2008年第4期248-253,共6页 天津大学学报(英文版)
基金 National Natural Science Foundation of China(No.50539120) National Basic Research Program of China("973"Program,No. 2007 CB714101) National Science Fund for Distinguished Young Scholars of China(No.50525927) National Natural Science Founda-tion of China(No.50579045)
关键词 high arch dam construction dynamic simulation schedule forecasting real-time control 高拱坝建筑 动力学模拟 时间预测 实时控制
  • 相关文献

参考文献9

二级参考文献45

共引文献69

同被引文献70

引证文献6

二级引证文献115

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部