期刊文献+

KD-50-I-E平台的FCD并行计算与交通动态诱导 被引量:3

FCD parallel computing and dynamic guidance for urban traffic on KD-50-I-E
下载PDF
导出
摘要 Intelligent traffic system(ITS) is a development trend for urban modern traffic.Active guidance control for urban traffic can relieve increasing traffic congestion pressure effectively.FCD(floating car data) based dynamic guidance for urban traffic is one of the directions of traffic control research.To meet the real-time demand for massive FCD processing,an FCD parallel computing based dynamic traffic guidance approach is presented and implemented.The FCD properties are analyzed in detail.An FCD parallel computing based dynamic traffic guidance system is developed on KD-50-I-E platform.Experimental results demonstrate the effectiveness and feasibility of the proposed approach. Intelligent traffic system (ITS) is a development trend for urban modern traffic. Active guidance control for urban traffic can relieve increasing traffic congestion pressure effectively. FCD (floating car data) based dynamic guidance for urban traffic is one of the directions of traffic control research. To meet the real-time demand for massive FCD processing, an FCD parallel computing based dynamic traffic guidance approach is presented and implemented. The FCD properties are analyzed in detail. An FCD parallel computing based dynamic traffic guidance system is developed on KD-50-I-E platform. Experimental results demonstrate the effectiveness and feasibility of the proposed approach.
出处 《中国科学技术大学学报》 CAS CSCD 北大核心 2009年第5期558-560,共3页 JUSTC
关键词 交通动态 诱导 并行计算 FCD 城市化进程 城市交通流 平台 交通拥塞 floating car data traffic guidance parallel computing high performance computer KD-50-I-E
  • 相关文献

参考文献7

  • 1唐克双,姚恩建.日本ITS开发和运用的实例——名古屋基于浮动车信息的P-DRGS简介[J].城市交通,2006,4(3):74-76. 被引量:11
  • 2Pfoser D, Tryfona N, Voisard A. Dynamic travel time maps-enabling efficient navigation[C]// 18th International Conference on Scientific and Statistical Database Management. Vienna: IEEE Press, 2006: 369-378.
  • 3Comert G, Cetin M. Queue length estimation from probe vehicle location and the impacts of sample size [J]. European Journal of Operational Research, 2009, 197(1): 196-202.
  • 4Eisenman S M, List G F. Using probe data m estimate OD matriees[C]//The 7th International IEEE Conference on Intelligent Transportation Systems. Washington: IEEE Press, 2004: 291-296.
  • 5Lu W, Wang W J, Kimita K, et al. Decreasing FCD processing delay by deploying distributed processing system[C]//6th International Conference on ITS Tele- communications. INSPEC, 2006: 206-209.
  • 6Zhang Z H, Jiang C J, Fang Y. Road situation modeling ard parallel algorithm implementation with FO3 based on principle curves [C]// Proceedings of the Eighth International Conference on High-Performance Computing in Asia-Padfie Region. Washington: IEEE Computer Society, 2005.6-11.
  • 7张俊霞,张焕杰,李会民.基于龙芯2F的国产万亿次高性能计算机KD-50-I的研制[J].中国科学技术大学学报,2008,38(1):105-108. 被引量:11

二级参考文献6

  • 1TOP500 Supercomputing Sites [DB/OL]. http:// www. top500. org/lists/2007 /11. 2007.
  • 2Sun Jiachang, Yuan Guoxing, Zhang Linbo, et al. 2007 China Topl00 List of High Performance Computer[DB/OL]. http://www. samss. org. cn/2007- China-HPC-TOP100-20071110-eng. htm. 2007.
  • 3中国科学院计算技术研究所.龙芯2F处理器用户手册[G].2007.
  • 4Bruck J, Ho C T, Kipis S, et al. Efficient algorithms for all-to-all communications in multiport messagepassing systems [J]. IEEE Transactions on Parallel and Distributed Systems, 1997, 8(11): 1 143-1 156.
  • 5Lawson C L, Hanson R J, Kincaid D R, et al. Basic linear algebra subprograms for FORTRAN usage [J]. ACM Transactions on Mathematical Software, 1979, 5 (3) : 308-323.
  • 6Whaley R C, Petitet A, Dongarra J J. Automated empirical optimization of software and the ATLAS project [J]. Parallel Computing, 2001, 27 (1/2): 3-35.

共引文献20

同被引文献17

  • 1杨喆,陈锋.使用MapReduce编程模型进行大规模FCD并行处理[J].电子技术(上海),2010(9):17-19. 被引量:3
  • 2马金伟,江冰.基于GPS/GPRS的车载卫星定位系统的研究[J].计算机测量与控制,2006,14(12):1676-1679. 被引量:18
  • 3Kunihiro Y, Hasunuma S. Latest Trends in Car Navigation and Telematies Services in Japan [A]. 14th World Congress on Intelligent Transport System[C]. 2007.
  • 4Zhen N B, Li Q Q, Dynamic routing based on real--time traffic information in LBS [A]. The 4th International Symposium on Multispectral Image Processing and Pattern Recognition [C]. 2005.
  • 5Li Q Q, Zuo X Q; Trends & Study Status Of Linear Data Model of GIS--T [J]. Geography and Geo-- Information Science, 2004, 20 (3):31 - 35.
  • 6XIAOGANG H, YUEFENG L,LEI Y,et al. Parallel map matching algorithm based on multi-core and MPI [C]// proceedings of the Remote Sensing,Environment and Transportation Engineering (RSETE),2011: 2291-2294.
  • 7BOUILLET E,RANGANATHAN A. Scalable,Real-Time Map- Matching Using IBM's System S[C]//proceedings of the Mobile Data Management (MDM), 2010: 249-254.
  • 8WENJIA W,MIZUTA H. Probe car based traffic information system experiment in shenyang [C]// proceedings of the ITS Telecommunications, 2008 : 1-3.
  • 9WEI L,WENGJIA W,KAZUYA K,et al. Decreasing FCD Processing Delay by Deploying Distributed Processing System[C]//proeeedings of the ITS Telecommunications Proceedings, 2006: 206-210.
  • 10ZHAOHUI Z,CHANGJUN J,YU F. Road situation modeling and parallel algorithm implementation with FCD based on principle curves [C] //proceedings of the High-Performance Computing in Asia-Pacific Region, 2005 : 1-6.

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部