Solving Resource-constrained Multiple Project Scheduling Problem Using Timed Colored Petri Nets

Solving Resource-constrained Multiple Project Scheduling Problem Using Timed Colored Petri Nets
原文传递
导出
摘要 To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between traditional network diagram such as CPM(critical path method)/PERT(program evaluation and review technique) and TCPN was presented.Then a primary TCPN(PTCPN) for solving RCMPSP was modeled based on the proposed mapping mechanism.Meanwhile,the object PTCPN was used to simulate the multiple projects scheduling and to find the approximately optimal value of RCMPSP.Finally,the performance of the proposed approach for solving RCMPSP was validated by executing a mould manufacturing example. To solve the resource-constrained multiple project scheduling problem (RCMPSP) more effectively, a method based on timed colored Petri net (TCPN) was proposed. In this methodology, firstly a novel mapping mechanism between traditional network diagram such as CPM (critical path method)/PERT (program evaluation and review technique) and TCPN was presented. Then a primary TCPN (PTCPN) for solving RCMPSP was modeled based on the proposed mapping mechanism. Meanwhile, the object PTCPN was used to simulate the multiple projects scheduling and to find the approximately optimal value of RCMPSP. Finally, the performance of the proposed approach for solving RCMPSP was validated by executing a mould manufacturing example.
出处 《Journal of Shanghai Jiaotong university(Science)》 EI 2009年第6期713-719,共7页 上海交通大学学报(英文版)
关键词 timed colored Petri nets resource-constrained multiple project scheduling problem (RCMPSP) mapping mechanism 赋时着色Petri网 调度问题 资源受限 项目 计划评审技术 求解 映射机制 关键路径法
  • 相关文献

参考文献11

  • 1Antonio Lova,Pilar Tormos.Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling[J].Annals of Operations Research (-).2001(1-4)
  • 2J. Prashant Reddy,S. Kumanan,O.V. Krishnaiah Chetty.Application of Petri Nets and a Genetic Algorithm to Multi-Mode Multi-Resource Constrained Project Scheduling[J].International Journal of Advanced Manufacturing Technology.2001(4)
  • 3Liao Ren,Chen Qing-xin,Mao Nin.A heuristic algorithm for resource-constrained project scheduling[].Journal of Industrial Engineering and Engineering Management.2002
  • 4Yuan Chong-yi.Petri net theory and its application[]..2005
  • 5Kim J W,Desrochers A A,Sanderson A C.Task planning and project management using Petri nets[].Proceedings of the IEEE International Sym- posium on Assembly and Task Planning.1995
  • 6Scot E Fricke,Aaron J Shenhar.Managing Multiple Engineering Projects in a Manufacturing Support Environment[].IEEE Transactions on Engineering Management.2000
  • 7KwanWoo Kim,YoungSu Yun,JungMo Yoon,Mitsuo Gen,Genji Yamazaki."Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling"[].Computers in Industry.2005
  • 8J. L. Peterson."Petri Net Theory and the Modeling of Systems"[]..1981
  • 9Ashok Kumar V K,L S Ganesh.Use of Petri nets for resource allocation in projects[].IEEE Transactions on Engineering Management.1998
  • 10Jensen K.Colored Petri Nets: Basic Concepts, Analysis Methods and Practical Use[]..1992

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部