Based on cutting principle and technology development of vertical blasthole cutby stage and deck in vertical shaft excavation, combined with the merits of middle spacecharging and toe space charging, the reinforced cutting effect of central large-diameterblasthole and the method of cutting blast by stage and deck toe space charging for thevertical large-diameter blastholes was put forward and analyzed theoretically.This new cutblasting method is provided with the advantages of high blasthole using ratio, big cavitybulk, low rate of chunk, even lumpiness, and relatively high energy using ratio.The parameterchoices and practical effects of this cutting method were discussed after in situexperiment.It shows that the decked delay time of 75~100 ms is applicable.
Based on cutting principle and technology development of vertical blasthole cut by stage and deck in vertical shaft excavation, combined with the merits of middle space charging and toe space charging, the reinforced cutting effect of central large-diameter blasthole and the method of cutting blast by stage and deck toe space charging for the vertical large-diameter blastholes was put forward and analyzed theoretically. This new cut blasting method is provided with the advantages of high blasthole using ratio, big cavity bulk, low rate of chunk, even lumpiness, and relatively high energy using ratio. The parameter choices and practical effects of this cutting method were discussed after in situ experiment. It shows that the decked delay time of 75-100 ms is applicable.
基金
Supported by the National Natural Science Foundation of China(50764001)
Ministry of Education"Chunhui Program",Guizhou Outstanding Young Talents Foundation(200705)
Scientific and Technological Tack-ling Project of Guizhou Province(20073015)