期刊文献+

驯化污泥固定化快速启动BAC反应器的研究 被引量:3

Immobilization of Acclimated Sludge for Quick Start-up of Biological Activated Carbon Reactor
下载PDF
导出
摘要 采用驯化污泥以动态挂膜和静态膜固定的方法进行了生物活性炭(BAC)反应器的快速挂膜和启动研究。将驯化污泥配制成500mg/L的污泥菌液,控制挂膜污泥量为2~4g/L、挂膜液循环流量为400~560mL/min并以下向流循环方式运行,在1~2d内就能实现BAC的稳定挂膜。启动后应用其处理某垃圾焚烧厂渗滤液处理站的生化处理出水,对COD的去除率〉70%,显薯优于SBR法的处理效果. Acclimated sludge with dynamic and static biofilm formation was used to study the quick start-up of BAC reactor. A 500 mg/L sludge solution is prepared by acclimated sludge, the sludge for biofilm formation is controlled at 2 to 4 g/L, and the circular flow of biofilm-forming solution is set at 400 to 560 mL/min. The steady biofilm formation can be achieved within 1 to 2 days in the BAC operated in down-flow mode. After start-up, when the BAC reactor is used for advanced treatment of biochemical effluent from leachate treatment station of a municipal solid waste incineration plant, the COD removal rate is more than 70%, which is superior to the treatment efficiency by SBR process.
出处 《中国给水排水》 CAS CSCD 北大核心 2010年第5期26-29,共4页 China Water & Wastewater
基金 国家水体污染控制与治理科技重大专项(2008ZX07315) 教育部科技创新工程重大项目培育基金资助项目(708071) 重庆市教委科学技术研究项目(KJ061205)
关键词 生物活性炭 挂膜 启动 驯化污泥 垃圾渗滤液 biological activated carbon biofilm tbrmation start-up acclimated sludge landfill leachate
  • 相关文献

参考文献4

二级参考文献18

共引文献98

同被引文献24

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部