电力市场中AGC辅助服务的成本研究综述 被引量:8

Overview of AGC ancillary service costs in electric market
下载PDF
导出
摘要 基于AGC辅助服务自身的特点,从电厂侧和调度侧两方面研究了AGC成本。其中电厂侧的成本包括投资成本、运行成本、维护成本、调度成本和机会成本;而调度侧的成本有设备投资及维护成本、控制成本与校正成本。给出了电厂侧投资成本的两种量化方法,考虑了变工况运行对维护成本的影响,提出了调度成本的量化公式,分析了机会成本的多种计算思路。调度侧除了考虑了调度主站及主站与电厂之间的设备固定成本,还从系统整体协调控制的角度分析了易被忽略的控制成本,给出了校正成本的计算方式。最后就降低AGC成本的途径总结了若干可行性建议。 According to the characteristics of AGC(automatic generation control) ancillary service ,the costs of AGC are researched from the perspective of the power-station and the dispatch. The former include investment costs, operational costs,maintain costs, dispatch costs and opportunity costs, while the latter are capital and maintenance costs, controlling costs and adjustment costs.From the power-station’s point of view,two kinds of quantification methods are applied to calculate investment costs, the influence of instability of units on operational costs are considered, the quantification formula of dispatch costs is addressed ,and several thoughts on the opportunity costs are analyzed. With regard to the AGC costs in the dispatch,except for the equipment fixed costs of master staion and that between master station and power station, controlling costs prone to be ignored are derived from the angle of the power system’s coordination and control,and the quantification methods of adjustment costs are exhibited. The last are some feasible suggestions for reducing the AGC costs.
出处 《电力系统保护与控制》 EI CSCD 北大核心 2010年第24期56-60,76,共6页 Power System Protection and Control
基金 国家自然科学基金(50577002)~~
关键词 辅助服务市场 自动发电控制 成本分析 量化计算 机会成本 ancillary service market automatic generation control cost analysis quantitative calculation opportunity cost
  • 相关文献

参考文献17

  • 1ERIC HIRST,BRENDAN KIRBY.Costs for electric-power ancillary services[J].The Electricity Journal,1996,9(10):26-30.
  • 2KONSTANTIN STASCHUS.Review of german approaches to ancillary services costing and pricing[C].//Proceedings of IEE Colloquium on Pricing of Ancillary Services.London(UK):1996.
  • 3GRAEME A,CHOW N,BRIAN WIGDOROWIT Z.A methodology for the redesign of frequency control for AC networks[J].IEEE Transaction on Power Systems,2004,19(3):1546-1554.
  • 4陶春华,马光文.电力市场环境下AGC成本研究[J].华东电力,2006,34(4):5-6. 被引量:4
  • 5周峰,温步瀛,程浩忠.电力市场条件下发电厂AGC运行成本研究[J].华北电力技术,2002(10):31-33. 被引量:7
  • 6余燕山,盛德仁,任浩仁.自动发电控制(AGC)的结构分析及实际应用[J].华东电力,2005,33(4):52-55. 被引量:5
  • 7焦树建.关于电厂发电成本计算方法的探讨[J].燃气轮机技术,2000,13(3):7-10. 被引量:36
  • 8REASON J.When a slower ramp rate makes economic sense[J].Electrical World,1988,4:38-39.
  • 9BRANDWAJN V,LPAKCHI A,SHERKAT V.Tracking evolutionary trends in generation control[J].IEEE Computer Application in Power,1993,1(6):22-26.
  • 10ERIC HIRST.Maximizing generator profits across energy and ancillary-services market[J].The Electricity Journal,2000,13(5):61-69.

二级参考文献16

共引文献64

同被引文献78

引证文献8

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部