摘要
在石灰石—石膏湿法烟气脱硫(FGD)工艺系统中,吸收塔浆液溢流是较为常见的现象,它对FGD系统的稳定运行非常不利。通过分析产生吸收塔浆液溢流的各种原因,提出解决吸收塔浆液溢流的办法,保证脱硫系统的稳定运行。
In the wet limestone - gypsum flue gas desulfurization ( FGD ) process system ,the absorber seriflux overflowing is relatively common phenomenon that has very adverse to the regular operation of FGD systems. Through the analysis of various causes of absorber seriflux overflow,the method to solve the ,question were put forward in order to ensure the normal operation of desulfurization system.
出处
《电力科技与环保》
2011年第1期35-37,共3页
Electric Power Technology and Environmental Protection
关键词
湿法烟气脱硫
吸收塔浆液
泡沫
溢流
消泡剂
wet flue gas desulfu rization
absorption tower seriflux
foam
overflow
defoamer