In order to study the feasibility of treating petro chemical wastewater by the combination of anaerobic and aerobic biological process, a research of treating wastewater in UASB reactor and aeration basin has been conducted. The test results shows that under moderate temperature, with 5\^2 kgCOD/(m\+3·d) volumetric load of COD Cr in the UASB reactor and 24h of HRT, 85% removal rate of BOD 5 and 83% of COD \{Cr\} and 1\^34 m\+3/(m\+3·d) volumetric gas production rate can be obtained respectively. The aerobic bio degradability can be increased by 20%—30% after the petro chemical wastewater has been treated by anaerobic process. As Ns=0\^45 kgCOD/(kgMLSS·d), HRT=4h in the aeration tank, 94% removal rate of BOD 5, 93% of COD \{Cr\}, 98\^8% total removal rate of COD \{Cr\} and 99% removal rate of BOD 5 can be reached.
In order to study the feasibility of treating petro chemical wastewater by the combination of anaerobic and aerobic biological process, a research of treating wastewater in UASB reactor and aeration basin has been conducted. The test results shows that under moderate temperature, with 5\^2 kgCOD/(m\+3·d) volumetric load of COD Cr in the UASB reactor and 24h of HRT, 85% removal rate of BOD 5 and 83% of COD \{Cr\} and 1\^34 m\+3/(m\+3·d) volumetric gas production rate can be obtained respectively. The aerobic bio degradability can be increased by 20%—30% after the petro chemical wastewater has been treated by anaerobic process. As Ns=0\^45 kgCOD/(kgMLSS·d), HRT=4h in the aeration tank, 94% removal rate of BOD 5, 93% of COD \{Cr\}, 98\^8% total removal rate of COD \{Cr\} and 99% removal rate of BOD 5 can be reached.