The Urban and Rural Network Construction and Retrofit Projects Has Gained Great Progress
-
1Yao Huannian,Cao Meiyue(Xiamen Electric Power Administration, Xiamen).The Optimization on Operation Characteristicsof Urban Medium Voltage Network[J].Electricity,1998(3):27-29.
-
2Zhang Yongxing(Yuanbaoshan Power Plant).Retrofit of No.2 Boiler in Yuanbaoshan Power Plant[J].Electricity,1997(2):23-25.
-
3The Live Line Working on Progress[J].Electricity,1997(2):33-34.
-
4Rieter:Good Progress with Strategic Projects in A Steady Half Year[J].China Textile,2012(8):46-48.
-
5LI LiGui LU GuangHao YANG XiaoNiu ZHOU EnLe.Progress in polymer solar cell[J].Chinese Science Bulletin,2007,52(2):145-158. 被引量:4
-
6Jia Nansong,Liu Dongyuan Longyuan Electric Power Group Corporation.Application of Combined Cycle in Modernized Retrofit of Old Thermal Power Plants[J].Electricity,2000(2):37-41.
-
7Qin Jianzhu.Performance Analysis and Retrofit on 350-MW China-Made Supercritical Steam Turbines[J].Electricity,2012,23(2):37-42.
-
8Dong Zhenya,Liu Fuyi(Beijing Power Supply Bureau).Some Technical Proposals on Rural Power Grid Construction and Retrofit[J].Electricity,1999(3):32-35.
-
9$830m WB Loan Aids Essential Projects[J].Electricity,1997(3):37-37.
-
10Major Progress on Lithium-Sulfur Batteries[J].Bulletin of the Chinese Academy of Sciences,2013,27(3):188-188.