摘要
为降低深基坑工程由于地下水诱发的风险,有必要通过抽水试验确定各地层(特别是承压含水层)的水文地质参数。针对宁波轨道交通某车站深基坑工程,首先通过现场不同降压工况的抽水试验,获得了不同土层的水文地质参数。在此基础上,运用三维非稳定流有限差分法分析了降压方案的可行性,为今后类似工程的设计和施工提供了借鉴。
To reduce the design risk during deep foundation pit construction, it is necessary to take a dedicated pumping test to determine the parameters of various geological layers at the pit, especially those of the confined aquifer. In rela- tion to the complicated hydro-geological conditions at deep foundation pit in Ningbo City Metro, and by way of various hyper pumping tests under different lower pressure re- gimes, a model is established on the pumping test by means of three-dimensional unsteady flow finite differentiation method and the hydro-geological analysis. This conclusion of the pumping test and findings of expert examination could provide relevant technical support for the design and construction of rail transit lines in Ningbo City.
出处
《城市轨道交通研究》
北大核心
2012年第3期77-81,共5页
Urban Mass Transit
关键词
深基坑
抽水试验
有限差分法
deep foundation pit
pumping test
finite differentiation method