宁波轨道交通某车站深基坑工程承压水降压抽水试验及数值模拟 被引量:1

On Pumping Test and Numerical Simulation of Station Deep Foundation Pit in Ningbo Metro
下载PDF
导出
摘要 为降低深基坑工程由于地下水诱发的风险,有必要通过抽水试验确定各地层(特别是承压含水层)的水文地质参数。针对宁波轨道交通某车站深基坑工程,首先通过现场不同降压工况的抽水试验,获得了不同土层的水文地质参数。在此基础上,运用三维非稳定流有限差分法分析了降压方案的可行性,为今后类似工程的设计和施工提供了借鉴。 To reduce the design risk during deep foundation pit construction, it is necessary to take a dedicated pumping test to determine the parameters of various geological layers at the pit, especially those of the confined aquifer. In rela- tion to the complicated hydro-geological conditions at deep foundation pit in Ningbo City Metro, and by way of various hyper pumping tests under different lower pressure re- gimes, a model is established on the pumping test by means of three-dimensional unsteady flow finite differentiation method and the hydro-geological analysis. This conclusion of the pumping test and findings of expert examination could provide relevant technical support for the design and construction of rail transit lines in Ningbo City.
作者 张国良
出处 《城市轨道交通研究》 北大核心 2012年第3期77-81,共5页 Urban Mass Transit
关键词 深基坑 抽水试验 有限差分法 deep foundation pit pumping test finite differentiation method
  • 相关文献

参考文献4

  • 1曹岩,张卫国,高世轩,等.宁波市轨道交通1号线一期工程东门口站基坑降水方案[R].上海:上海地矿工程勘察有限公司,2010.
  • 2朱成兵,张卫国,高世轩,等.宁波市轨道交通1号线一期工程TJ-Ⅲ标东门口站抽水试验报告[R].上海:上海地矿工程勘察有限公司,2010.
  • 3JGJ/T11-98建筑与市政降水工程技术规范[S].
  • 4崔涛.宁波地铁市府站深基坑抽水试验及数值分析[J].城市轨道交通研究,2010,13(5):79-84. 被引量:4

二级参考文献7

  • 1金叶,孙建军,梁伟,等.宁波市轨道交通1号线一期工程市府站基坑围护设计[R].上海:上海市隧道工程轨道交通设计研究院,2009.
  • 2潘永坚,肖承辉,邵再良,等.宁波市轨道交通1号线一期工程市府站岩土工程勘察报告[R].宁波:浙江省工程勘察院,2009.
  • 3朱成兵,张卫国,高世轩,等.宁波市轨道交通1号线一期工程TJ-Ⅲ标市府站抽水试验报告[R].上海:上海地矿工程勘察有限公司,2009.
  • 4姚天强,石振华.基坑降水手册[M].北京:中国建筑工业出版社,2009.
  • 5施鑫源,阮淼森,王世杰.等.供水水文地质手册[M].北京:地质出版社,1983.
  • 6JGJ/T111-98.建筑与市政降水工程技术规范[S].[S].,..
  • 7薛禹群.地下水动力学[M].北京:地质出版社,1986.15-20.

共引文献3

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部