摘要
The development and implementation of a real-time flood forecasting system with a hydro-meteorological operational alert procedure during the MAP-D-PHASE Project is described in this paper. This chain includes both probabilistic and deterministic forecasts. The hydrological model used to generate the runoff simulations is the rainfall-runoff distributed FEST-WB model, developed at Politecnico di Milano. The observed data to run the control simulations were supplied by ARPA-Piemonte. The analysis is focused on Maggiore Lake basin, an Alpine basin between North-West of Italy and Southern Switzerland. Two hindcasts during the D-PHASE period are discussed in order to evaluate certain effects regarding discharge forecasts due to hydro-meteorological sources of uncertainties. In particular, in the June convective event it is analysed how the effect of meteorological model spatial resolution can influence the discharge forecasts over mountain basins, while in the November stratiform event how the effect of the initial conditions of soil moisture can modify meteorological warnings. The study shows how the introduction of alert codes appears to be useful for decision makers to give them a spread of forecasted QDFs with the probability of event occurrence, but also how alert warnings issued on the basis of forecasted precipitation only are not always reliable.