期刊文献+

浅埋暗挖洞桩(柱)逆作法设计关键技术分析 被引量:17

Analysis on key design technology of Pilot-tunnel & Pile (Column) top-down method
下载PDF
导出
摘要 通过对浅埋暗挖洞桩(柱)逆作法的深入剖析,针对其特点,论述洞桩(柱)法结构关键受力构件的设计技术要点,包括边桩、钢管混凝土中间立柱、中间桩基础、条形基础等构件的承载力、变形及稳定性分析,给出提高土体开挖稳定性和地基承载力的措施,以及采用该工法建造地铁车站时合理埋深的确定原则等。 Basic on further analysis on the characteristics of the Pilot-tunnel & Pile(Column) top-down method, key design technology points were discussed on the bearing capacity, deformation and stability of the main forced components which include the side pries, the middle concrete filled steel tubular piles, the middle pile foundation, the bar foundation, etc.. Some measures for improving the soil stability during the construction and the bearing capacity of soil foundation are presented. Moreover, the principle of the rational buried depth for metro station built by the Priot-tunnel & Pile(Columa) top-down method is suggested.
作者 杨秀仁
出处 《都市快轨交通》 北大核心 2012年第2期64-68,共5页 Urban Rapid Rail Transit
关键词 浅埋暗挖法 盖挖逆作法 洞桩逆作法(洞桩法) 洞柱逆作法(洞柱法) 地铁车站 shallow mining method, cover and cut top-down method, Pilot-tunnel & Pile top-down method, Pilot-tunnel & Column top -down method, metro station
  • 相关文献

参考文献7

  • 1GB50157—2003地铁设计规范[S].北京:中国计划出版社,2003.
  • 2GB50009—2001建筑结构荷载规范[S].2006版.北京:中国建筑工业出版社,2006.
  • 3GB50010—2010混凝土结构设计规范[S].北京:中国建筑工业出版社,2010.
  • 4DBJ11—501—2009北京地区建筑地基基础勘察设计规范[S].北京:中国计划出版社,2009.
  • 5YB9258—97建筑基坑工程技术规范[S].北京:冶金工业出版社,1997.
  • 6夏民耀,曾进伦.地下工程设计施工手册[M].北京:中国建筑工业出版社,2001.
  • 7黄美群.一次扣拱暗挖逆作法修建地铁车站新技术[J].都市快轨交通,2009,22(6):66-71. 被引量:24

二级参考文献1

  • 1北京城建设计研究总院.北京地铁四号线、十号线工程黄庄站施工图文件[G],2003-2005.

共引文献40

同被引文献66

引证文献17

二级引证文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部