摘要
南充轻烃回收装置经过三次技改,仍不完善,液化气塔夏季难以建立正常的操作平衡,塔压超高,操作困难,收率较低、成本较高。本文对装置存在的这一问题进行了探索、分析及论证,并以2012年南充轻烃装置大修为契机,提出解决这一问题的技改方案。
light hydrocarbon recovery unit at Nanchong has gone through triple technological transformation,but it is still imperfect,and the liquefied gas tower is hard to keep steady operation balance in summer.The tower is in conditions of ultra-high tower pressure,difficult operation,low yield and high cost.This paper explored and analyzed the problems of the unit,and proposed a solution to the problems.
出处
《石油与天然气化工》
CAS
CSCD
2012年第6期573-575,624,共3页
Chemical engineering of oil & gas
关键词
轻烃回收装置
液化气塔
冷凝器
分析论证
light hydrocarbon recovery unit,liquefied gas tower,condenser,analytic demonstration