摘要
煤矿工作面顺槽普遍使用顺槽连续牵引车绞车运输物料及设备,一般由于顺槽长度过长导致单趟运输时间较长,运输效率低下。采用主、副绳分别牵引运输,运输效率将提高一倍。
widespread use of roadway continuous tractor winch for materials and equipment transportation at the coal mine generally led to low transportation efficiency due to long-time transportation time for one-pass. Using primary and secondary rope traction transportation will double the transportation efficiency. :
出处
《煤矿现代化》
2013年第5期103-105,共3页
Coal Mine Modernization
关键词
顺槽
连续牵引车绞车
三轨两线
高效运输
roadway
continuous tractor winch
third rail two lines
high efficiency transport