期刊文献+

New method for plugging channeling in oil field by nitrogen foam

New method for plugging channeling in oil field by nitrogen foam
下载PDF
导出
摘要 In order to present a new method for plugging channeling in oil field,the injection modes and validity period of foam system which plugged the formation water layer were studied by means of the experimental model which simulated the real conditions of oil wells existing channeling.Above all,the influence factors including reservoir pressure,permeability,oil saturation and gas-to-liquid ratio were studied through dynamic experiment.Then,in light of the technology characteristics of foam injection in oil field,the comparison between gas-liquid and liquid-gas injection modes was studied.The result shows that the gas-liquid injection mode can ensure the foam injectivity and plugging performance.The plugging validity of nitrogen foam injected into the formation water layer was evaluated in different plugging pressure gradients by the dynamic method which is more reasonable than the static evaluation method in laboratory.The research demonstrates that the plugging validity period of foam decreases with plugging pressure gradient increasing.If the plugging pressure gradient is 0.15 MPa/m,the validity period is 160 h.Finally,a empirical equation and a plate about the plugging validity and the plugging pressure gradient were obtained for forecasting the validity period of foam. In order to present a new method for plugging channeling in oil field,the injection modes and validity period of foam system which plugged the formation water layer were studied by means of the experimental model which simulated the real conditions of oil wells existing channeling.Above all,the influence factors including reservoir pressure,permeability,oil saturation and gas-to-liquid ratio were studied through dynamic experiment.Then,in light of the technology characteristics of foam injection in oil field,the comparison between gas-liquid and liquid-gas injection modes was studied.The result shows that the gas-liquid injection mode can ensure the foam injectivity and plugging performance.The plugging validity of nitrogen foam injected into the formation water layer was evaluated in different plugging pressure gradients by the dynamic method which is more reasonable than the static evaluation method in laboratory.The research demonstrates that the plugging validity period of foam decreases with plugging pressure gradient increasing.If the plugging pressure gradient is 0.15 MPa/m,the validity period is 160 h.Finally,a empirical equation and a plate about the plugging validity and the plugging pressure gradient were obtained for forecasting the validity period of foam.
出处 《Journal of Central South University》 SCIE EI CAS 2014年第2期677-683,共7页 中南大学学报(英文版)
基金 Project(2006CB705800)supported by the National Basic Research Program of China
关键词 foam system plugging performance CHANNELING injection mode plugging validity 氮气泡沫 油田 封堵 压力梯度 液体喷射 注入模式 评价方法 含油饱和度
  • 相关文献

参考文献9

二级参考文献64

共引文献211

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部