期刊文献+

宝口站“2013.08”特大洪水流量确定

“2013. 08” Flood Discharge in Baokou Station
下载PDF
导出
摘要 受强台风“尤特”登录影响,白盆珠水库流域发生了超百年一遇特大洪水。该文采用水位~流量关系、 Q~A R关系、比降-面积及瞬时单位线等方法推求白盆珠水库上游宝口站洪峰流量,并对推求的结果进行对比分析,以确定合理的洪峰流量。其分析成果可为今后流域开发治理、工程规划设计、防灾减灾等工作提供参考。 Affected by Typhoon Utor make landfall , a flood of 100 years recurrence encountered in Baipenzhu Reservoir Basin .Peak flow of Baipenzhu reservoir upstream Baokou station has been calculated by the methods of stage -discharge relation , Chezy formu-la, roughness for and instantaneous unit hydrograph .With comparative analysis on the calculation results , the reasonable peak flow has been determined .And the results can be reference for the development and treatment of river basins , engineering program de-sign, disaster prevention and reduction and mitigation work in the future .
作者 韩灯亮
出处 《广东水利水电》 2014年第8期71-76,共6页 Guangdong Water Resources and Hydropower
关键词 宝口站 特大洪水 洪峰流量 合理性分析 Baokou hydrologic station catastrophic flood peak flow analysis of rationality
  • 相关文献

参考文献4

二级参考文献8

  • 1吴持恭.水力学[M].北京:高等教育出版社,1984..
  • 2水利电力部水利司.水文测验手册(第一册)[M].北京:水利电力出版社,1957
  • 3广东省暴雨径流查算图表使用手册[M].
  • 4广东省水文局湛江分局.雷州半岛"2007.8"特大暴雨洪水分析成果[R].
  • 5SL247-1999水文资料整编[S].北京:中国水利水电出版社,1999.
  • 6水文测验手册(第一册)[M].北京:水利水电出版社,1975.
  • 7SL196-97.水文调查规范[S].[S].,..
  • 8SD 174-85,比降-面积法测流规范[S].

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部