期刊文献+

Target reliability index for serviceability limit state of single piles 被引量:3

Target reliability index for serviceability limit state of single piles
下载PDF
导出
摘要 The objective is to develop an approach for the determination of the target reliability index for serviceability limit state(SLS) of single piles. This contributes to conducting the SLS reliability-based design(RBD) of piles. Based on a two-parameter,hyperbolic curve-fitting equation describing the load-settlement relation of piles, the SLS model factor is defined. Then, taking into account the uncertainties of load-settlement model, load and bearing capacity of piles, the formula for computing the SLS reliability index(βsls) is obtained using the mean value first order second moment(MVFOSM) method. Meanwhile, the limit state function for conducting the SLS reliability analysis by the Monte Carlo simulation(MCS) method is established. These two methods are finally applied to determine the SLS target reliability index. Herein, the limiting tolerable settlement(slt) is treated as a random variable. For illustration, four load test databases from South Africa are compiled again to conduct reliability analysis and present the recommended target reliability indices. The results indicate that the MVFOSM method overestimates βsls compared to that computed by the MCS method. Besides, both factor of safety(FS) and slt are key factors influencing βsls, so the combination of FS and βsls is welcome to be used for the SLS reliability analysis of piles when slt is determined. For smaller slt, pile types and soils conditions have significant influence on the SLS target reliability indices; for larger slt, slt is the major factor having influence on the SLS target reliability indices. This proves that slt is the most key parameter for the determination of the SLS target reliability index. The objective is to develop an approach for the determination of the target reliability index for serviceability limit state(SLS) of single piles. This contributes to conducting the SLS reliability-based design(RBD) of piles. Based on a two-parameter,hyperbolic curve-fitting equation describing the load-settlement relation of piles, the SLS model factor is defined. Then, taking into account the uncertainties of load-settlement model, load and bearing capacity of piles, the formula for computing the SLS reliability index(βsls) is obtained using the mean value first order second moment(MVFOSM) method. Meanwhile, the limit state function for conducting the SLS reliability analysis by the Monte Carlo simulation(MCS) method is established. These two methods are finally applied to determine the SLS target reliability index. Herein, the limiting tolerable settlement(slt) is treated as a random variable. For illustration, four load test databases from South Africa are compiled again to conduct reliability analysis and present the recommended target reliability indices. The results indicate that the MVFOSM method overestimates βsls compared to that computed by the MCS method. Besides, both factor of safety(FS) and slt are key factors influencing βsls, so the combination of FS and βsls is welcome to be used for the SLS reliability analysis of piles when slt is determined. For smaller slt, pile types and soils conditions have significant influence on the SLS target reliability indices; for larger slt, slt is the major factor having influence on the SLS target reliability indices. This proves that slt is the most key parameter for the determination of the SLS target reliability index.
出处 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第1期310-316,共7页 中南大学学报(英文版)
基金 Projects(51278216,51308241)supported by the National Natural Science Foundation of China Project(2013BS010)supported by the Funds of Henan University of Technology for High-level Talents,China
关键词 single pile serviceability limit state target reliability index mean value first order second moment method Monte Carlo simulation 极限状态函数 可靠性指标 单桩 可靠性分析 目标可靠指标 曲线拟合方程 蒙特卡罗模拟 SLS
  • 相关文献

参考文献20

  • 1WANG Y, KULHAWY F H. Reliability index for serviceability limit state of building fotmdations [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2008, 134(11): 1587-1594.
  • 2CHRISTIAN J T, LADD C C, BAECHER G B. Reliability applied to slope stability analysis [J]. Journal of Geotechnical Engineering, 1994, 120(12): 2180-2207.
  • 3PHOON K K, KULHAWY F H. Characterization of geotechnical variability [J]. Canadian Geotechnical Journal, 1999, 36(4): 612-.
  • 4WHITMAN R V. Organizing and evaluating uncertainty in geotechnical engineering [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2000, 126(7): 583-593.
  • 5DITHINDE M, PHOON K K, WET M D, RETIEF J V. Characterization of model uncertainty in the static pile design formula [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2011, 137(1): 70- 85.
  • 6PHOON K K, QUEK S T, CHOW Y K, LEE S L. Reliability analysis of pile settlement [J]. Journal of Geotechnical Engineering, 1990, 116(11): 1717-1735.
  • 7QUEK S T, PHOON K K, CHOW Y K. Pile group settlement: A probabilistie approach [J]. International Journal for Numerical and Analytical Methods in Geomechanies, 1991, 15(11): 817-832.
  • 8QUEK S T, CHOW Y K, PHOON K K. Further contributions to reliability-based pile settlement analysis [J]. Journal of Geotechnical Engineering, 1992, 118(5): 726-742.
  • 9PHOON K K, KULHAWY F H, GRIGORIU M D. Reliability-based design of foundations for transmission line structures [R]. Report TR-105000, EPRI, Palo Alto, 1995.
  • 10PHOON K K, KULHAWY F H, GRIGORIU M D. Development of a reliability-based design framework for transmission line structure foundations [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2003, 129(9): 798-806.

同被引文献31

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部